What Would You Build With Nearly $4 Billion?
Decatur Metro | December 10, 2009
A proposed underground tunnel that would bust it’s way through many East Atlanta neighborhoods to “alleviate traffic” on the Downtown Connector is projected on a GDOT Workshop Project sheet (page 11) to cost $3.7 billion dollars.
Which got me thinking. What would any half-sane, non-political body (that’s you!) do with $4 billion to elevate Atlanta’s traffic congestion?
P.S. Click the map to the right to enlarge it.











