<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	
	>
<channel>
	<title>Comments on: MARTA &amp; GA Lawmakers Get Bailed Out</title>
	<atom:link href="/2009/05/27/marta-ga-lawmakers-get-bailed-out/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.decaturmetro.com/2009/05/27/marta-ga-lawmakers-get-bailed-out/</link>
	<description>Decatur Georgia News, Events, Atlanta News</description>
	<lastBuildDate>Mon, 15 Sep 2014 01:05:18 +0000</lastBuildDate>
		<sy:updatePeriod>hourly</sy:updatePeriod>
		<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=4.0</generator>
	<item>
		<title>By: Steve</title>
		<link>http://www.decaturmetro.com/2009/05/27/marta-ga-lawmakers-get-bailed-out/#comment-10269</link>
		<dc:creator><![CDATA[Steve]]></dc:creator>
		<pubDate>Sun, 31 May 2009 17:37:50 +0000</pubDate>
		<guid isPermaLink="false">http://www.decaturmetro.com/?p=20705#comment-10269</guid>
		<description><![CDATA[That may have been it - I wasn&#039;t around at the time but I have been told about a problem.  I imagine Lyn Menne can clarify.]]></description>
		<content:encoded><![CDATA[<p>That may have been it &#8211; I wasn&#8217;t around at the time but I have been told about a problem.  I imagine Lyn Menne can clarify.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Decatur Metro</title>
		<link>http://www.decaturmetro.com/2009/05/27/marta-ga-lawmakers-get-bailed-out/#comment-10264</link>
		<dc:creator><![CDATA[Decatur Metro]]></dc:creator>
		<pubDate>Sun, 31 May 2009 12:59:06 +0000</pubDate>
		<guid isPermaLink="false">http://www.decaturmetro.com/?p=20705#comment-10264</guid>
		<description><![CDATA[Something about water underground, right Steve?]]></description>
		<content:encoded><![CDATA[<p>Something about water underground, right Steve?</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Steve</title>
		<link>http://www.decaturmetro.com/2009/05/27/marta-ga-lawmakers-get-bailed-out/#comment-10192</link>
		<dc:creator><![CDATA[Steve]]></dc:creator>
		<pubDate>Sat, 30 May 2009 20:31:53 +0000</pubDate>
		<guid isPermaLink="false">http://www.decaturmetro.com/?p=20705#comment-10192</guid>
		<description><![CDATA[Yes, the dig in Atlanta was much deeper and generally didn&#039;t involved cut-and-cover.  It was supposed to be deeper through Decatur, but there were some engineering problems.]]></description>
		<content:encoded><![CDATA[<p>Yes, the dig in Atlanta was much deeper and generally didn&#8217;t involved cut-and-cover.  It was supposed to be deeper through Decatur, but there were some engineering problems.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Lisa</title>
		<link>http://www.decaturmetro.com/2009/05/27/marta-ga-lawmakers-get-bailed-out/#comment-10191</link>
		<dc:creator><![CDATA[Lisa]]></dc:creator>
		<pubDate>Sat, 30 May 2009 19:11:20 +0000</pubDate>
		<guid isPermaLink="false">http://www.decaturmetro.com/?p=20705#comment-10191</guid>
		<description><![CDATA[It may have caused heartache at that time, but I think that Decatur is better for it now that we have an underground MARTA line in the heart of our city rather than on the train tracks.

Why was the underground construction in Decatur so much more disruptive than downtown/midtown?  Did they dig deeper there or something?]]></description>
		<content:encoded><![CDATA[<p>It may have caused heartache at that time, but I think that Decatur is better for it now that we have an underground MARTA line in the heart of our city rather than on the train tracks.</p>
<p>Why was the underground construction in Decatur so much more disruptive than downtown/midtown?  Did they dig deeper there or something?</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Progressive Dem</title>
		<link>http://www.decaturmetro.com/2009/05/27/marta-ga-lawmakers-get-bailed-out/#comment-10147</link>
		<dc:creator><![CDATA[Progressive Dem]]></dc:creator>
		<pubDate>Sat, 30 May 2009 18:41:20 +0000</pubDate>
		<guid isPermaLink="false">http://www.decaturmetro.com/?p=20705#comment-10147</guid>
		<description><![CDATA[Valid points Lisa.  The East West line was a political necessity given DeKalb and Fulton&#039;s participation.  I believe some of the thinking at that time was that the east line would help bring workers into the then industrial rail corridor along the eat line.  Marta was planned in the late 1960&#039;s and early 70&#039;s, neighborhood pioneers were just beginning in Virginia Highlands and Mornigside.  Inman Park, Druid Hills, Decatur and Ansley were declining in value and condition.  Construction costs along the East line were also a major factor since the right of way was somewhat easier to acquire and above ground construction is lots cheaper than drilling and blasting through the granite that is evident in the Peachtree Center station.

One of the original planned MARTA lines was to run northeast through DeKalb and out towards Tucker.  It would have split from the east line near East Lake, and had a station at Clairmont and North Decatur; at North Druid Hills across from the golf driving range; in the industrial park behind Northlake Festival and onto Tucker.  It was also planned along the rail corridor. I think that would be a very well used line if it had been built.]]></description>
		<content:encoded><![CDATA[<p>Valid points Lisa.  The East West line was a political necessity given DeKalb and Fulton&#8217;s participation.  I believe some of the thinking at that time was that the east line would help bring workers into the then industrial rail corridor along the eat line.  Marta was planned in the late 1960&#8217;s and early 70&#8217;s, neighborhood pioneers were just beginning in Virginia Highlands and Mornigside.  Inman Park, Druid Hills, Decatur and Ansley were declining in value and condition.  Construction costs along the East line were also a major factor since the right of way was somewhat easier to acquire and above ground construction is lots cheaper than drilling and blasting through the granite that is evident in the Peachtree Center station.</p>
<p>One of the original planned MARTA lines was to run northeast through DeKalb and out towards Tucker.  It would have split from the east line near East Lake, and had a station at Clairmont and North Decatur; at North Druid Hills across from the golf driving range; in the industrial park behind Northlake Festival and onto Tucker.  It was also planned along the rail corridor. I think that would be a very well used line if it had been built.</p>
]]></content:encoded>
	</item>
</channel>
</rss>

<!-- Performance optimized by W3 Total Cache. Learn more: http://www.w3-edge.com/wordpress-plugins/

 Served from: www.decaturmetro.com @ 2014-09-15 09:09:52 by W3 Total Cache -->